Transport and Logistics Center

TLC is focused on servicing cargo flows at Kuryk port and providing logistics services to the port users.

TLC SARZHA LLP

  • TLC Sarzha Company is the operator of Kuryk port that provides storage of various types of cargo at the warehouses of the transport and logistics center with a temporary storage warehouse, and carries out all customs procedures at the terminals of Kuryk port as well as export and import operations, including cargo insurance.

KHAZAR PETROLEUM LOGISTICS LLP

Semurg Express FZC

LOGISTICS

Bulk Cargo Terminal

The terminal is designed for transshipment of oil, bulk oil cargo, and LPG, is located on the territory of 26 hectares, and will be equipped with two berths. The depth at the berths is 7 meters.

THE TERMINAL CAPACITY:

  • Oil and oil products - 2 600 000 tons per year
  • Liquefied petroleum gas (LPG) - 300 000 tons per year
LOGISTICS

Universal Reloading Terminal

The universal reloading terminal is intended for transshipment of general, bulk, and container cargo. It is located on the territory of 32 hectares and is equipped with three berths with the depth of 7 meters.

THE TERMINAL CAPACITY:

  • General and bulk cargoes - 1 650 000 tons per year
  • Containers - 150 000 TEU per year
LOGISTICS

Ferry Complex

The ferry complex, implemented jointly with Kazakhstan Temir Zholy National Company, includes a railway and a car ferry berths with a total transshipment capacity of 6 million tons per year.

THE TERMINAL CAPACITY:

  • The railway berth - 4 000 000 tons per year
  • The car berth - 2 000 000 tons per year
PRODUCTION

Production Complex

The production complex will combine a ship repairing yard and production of metal structures and caissons.

SHIP REPAIRING YARD

  • The first phase involves creation of a ship repairing yard. At the moment, all the ship repairing yards existing in Kazakhstan are focused on vessels up to 600 tons. The ship repairing yard in Kuryk aims to fill the lack of production capacity for repair of medium and large vessels. The second phase involves creation of a ship building yard that will be the first one in Kazakhstan.

PRODUCTION OF METAL STRUCTURES

  • Production of metal structures is planned to be carried out in the workshops of Kuryk port production complex for oil and gas projects in the Caspian Sea.

PRODUCTION OF CAISSONS

  • The caisson is a special construction forming under water or in water-saturated soil of the working chamber, free of water, to ensure construction of infrastructure facilities onto the top. Production of caissons for the needs of the Caspian Sea oil and gas projects is supposed to be created at Kuryk port production complex.